Material: PA66+25%GF, Stainless Steel Nickel Plating
Surface treatment: Smooth without any burrs
MOQ: 1 PCS
Color: Customized
Package: Carton Case+Blister box+PE Bags
Application: For PCBA, LED light and Battery Bottom Cover
Payment: T/T ; L/C; Alipay
Delivery time: 20-25 days for samples; 7-15 days for mass production(negotiation)
Place of origin: DongGuan; GuangDong
OEM/ODM is welcome
Size: according to customer's 3D and 2D drawings or samples
Certificate: ISO 9001:2015/ IATF 16949:2016/ ISO14001:2015/ ISO45001:2018
Product Description
1. We get these two products by manufacturing injection moulds and stamping moulds! We put them together, and in the middle will be the PCBA and the battery!
2. Metal and plastic need to have a very good match, our project is designed a very reasonable buckle, they will be firmly stuck together!
3. Our structural engineers and design engineers participated in the early stage of product design, providing and producing several samples for customers! Finally we decided on the best design solution!
4. The supplier has provided ROHS and REACH certification of the materials!
5. The mold production time is 20-25 days. But we invested half a year in the early research and development design! Customers are very satisfied with our service attitude, professionalism and patience!
Copyright © ©Copyright 2024 JSJM Technology Co., Ltd. all rights reserved - Privacy policy