Material: PC+Glass Fiber
Surface treatment: Normal Polishing
MOQ: 1 PCS
Color: Black
Package: Carton Case+PE Bags
Application: Used for Switch controller backplate bracket
Payment: T/T ; L/C; Alipay
Delivery time: 15-20 days for mold and samples; 7-15 days for mass production(negotiation)
Place of origin: DongGuan; GuangDong
OEM/ODM is welcome
Size: according to customer's 3D and 2D drawings or samples
Certificate: ISO 9001:2015/ IATF 16949:2016/ ISO14001:2015/ ISO45001:2018
Product Description
1. Adding glass fiber to the plastic can increase the structural strength of the product! But the difficult work of controlling the appearance of the product, we have well controlled the appearance of this product by debugging the machine!
2. Before the mold starts manufacturing, our engineering department made DFM report and a mold flow analysis report that addresses all possible problems!
3. Our factory has a lot of experience in this kind of structural parts, and we have helped the customer improve the design from the production point of view!
4. We can deliver 100,000 products in seven days and our factory has two shifts working 24 hours a day!
5. The mold production time is 15-20 days!
Copyright © ©Copyright 2024 JSJM Technology Co., Ltd. all rights reserved - Privacy policy