Material: PC
Surface treatment: Glossy Light
MOQ: 1 PCS
Color: White/Black
Package: Carton Case+PE Bags
Application: Used for Switchgear Top Housing
Payment: T/T ; L/C; Alipay
Delivery time: 20-25 days for samples; 7-15 days for mass production(negotiation)
Place of origin: DongGuan; GuangDong
OEM/ODM is welcome
Size: according to customer's 3D and 2D drawings or samples
Certificate: ISO 9001:2015/ IATF 16949:2016/ ISO14001:2015/ ISO45001:2018
Product Description
1. The surface of the product is required to be smooth and shiny, so we need to polish the surface of the mold repeatedly, using sandpaper from coarse to fine! Spend at least four days polishing!
2. The very demanding appearance determined that we needed to control every production process, from injection molding to packaging and shipping!
3. After injection molding, we need to use a thin PE film to cover the surface of the product, so that the product will not have any scratches during transportation!
4. A beautiful looking product is the key to win the market, our quality helps customers win more markets, so that the product is loved by more consumers!
5. The mold production time is 30-35 days. A perfect product needs the mold to be carefully crafted!
Copyright © ©Copyright 2024 JSJM Technology Co., Ltd. all rights reserved - Privacy policy